• 兴发娱乐

    Development History

    • 1972

      The first 18kW wind turbine in China, abreakthrough in medium-sized wind turbine in China.

    • 1997

      200kWwind turbine , the state-level scientific achievement.

    • 1999

      250kWwind turbine, the earliest wind turbine put into commercial use in China.

    • 2003

      WD49-750wind turbine, by Repower technology, over 500 units installed, availabilityover 97%. in operation for over 6 years.

    • 2006

      Getthe order of national authorized project in Danjinghe, Hebei province.

    • 2008

      WD1.5MWseries, the first wind turbine using latest load optimization controltechnology in China, was developed and put into batch production.

    • 2010

      ZheinagWndey Co., Ltd. is established through the shareholding reform.

      Windeybecomes the executor of State Key Laboratory of Wind Power System.

      2.5MW prototype completed.

    • 2011

      First Award for Scientific and Technology Progress in Zhejiangprovince.

      Selected as the Working Station for Academicians.

    • 2012

      1.5MWpast Low Voltage Ride Through Test by China Electrical Power Research Institute.

      Zhejiang key Laboratory of Wind Power System was completed.

    • 2013

      The first wind turbine exported to Iran succeeded in trial run.

      The post-doctoral working station starts.

    • 2014

      Special Award of China Mechanical Science was granted to Windeyfor the project “High-power Wind Turbine Development and Demonstration”.

    • 2015

      The registered trade mark was nominated as the Provincial FamousTrade Mark.

      The research institute under Windey’s administration was honoredas the “Key Research Institute of Zhejiantg Province”.

      The State Key Laboratory of Wind Power System was and approved bythe Ministry of Science.

    • 2016

      The company was awarded the title "2016 Zhejiang Top 100 High-tech Enterprises".

      WINDEY passed the first domestic WTGS PFMA(primary frequency modulation ability) test.

      WINDEY 2MW WTGS was conferred the title "Quality Products Made in Zhejiang" of 2016

    • 2017

      2MW WTGS was accredited as "The First Product in Zhejiang Province"

      The Zhejiang Strategic Alliance for Wind Power Industry Technology Innovation led by WINDEY successfully passed the acceptance.

      WINDEY's "Corporate Technology Center" was continuously rated as provincial-level excellent corporate technology center.

      The "Academician and Expert Workstation" was rated as provincial-level excellent academician and expert workstation.

      "WINDEY Zhejiang International Science and Technology Cooperation Base" was officially approved to be established.

      WINDEY fulfilled a "zero" breakthrough in international patents

      The commencement ceremony of WINDEY Xiyang Gaoluo Wind Farm Phase I took place.

      WINDEY won the first prize of Zhejiang Science and Technology Award for Machinery Industry in 2017

    • 2018

      WINDEY was awarded the title "Technological Innovation Demonstration Enterprise in Zhejiang Province"

      The first steel-concrete tower with a hub height of 120 meters was successfully hoisted

      WINDEY won the "First Prize of Zhejiang Science and Technology Award" again.

      WINDEY 3MW platform prototype was successfully connected to the grid

      The first WTGS of WINDEY4.XMW platform was successfully launched

    • 2019

      WINDEY was successfully listed on A-share market.

      WINDEY won the First Prize of Shanghai Science and Technology Progress Award for the first time.

      The roll-out ceremony for the first WTGS of WINDEY Harbin Wind Power Industry Equipment Base was successfully held

      WINDEY WD4500 WTGS successfully rolled off the production line

      WINDEY won “China Machinery Industry Science and Technology Award”

    • 2020

      WD2500 WTGS was conferred the title"Quality Products Made in Zhejiang" in 2019

      WINDEY 4.5MW prototype was successfully hoisted

      The world’s first 4.5MW three-level 1140V squirrel cage full power WTGS was successfully connected to the grid.

      WINDEY won the Excellent Prize of China Patent Award

      WINDEY won the first prize of Beijing Science and Technology Award

      The first WTGS of Vietnam Ninh Thuan Chinh Thang 50MW wind power project was hoisted

      WINDEY's first wind power project was connected to the grid for power generation

    • 2021

      Won the Quality Award of Zhejiang Provincial People's Government

      Won the Second Prize of National Science and Technology Progress Award

      Elected as the convenor of the IEC International Standards Working Group (JWG25)

      Launched the world's highest (170 meters) truss-type WTGS

      Put the wind farm with the world’s highest altitude (5158m) into production in Tibet

      The main structure of the Ulanqab Intelligent Industrial Park was completed

      Won the honor “CGN’s Five-star Supplier” again

      Completed the first grant of the Restricted Stock Incentive Plan

      Conferred the title "Zhejiang Leader in Per-mu Benefits"

    • 2022

      Successfully selected as a state-level "Green Factory"

      The Technology Center was recognized as the National Corporate Technology Center

      Successfully selected as a pilot enterprise of “Future Factory in Zhejiang Province” in 2022

      Won the highest rating "A" for information disclosure of listed companies in Shenzhen Stock Exchange

      Won the “2021 Zhejiang Science and Technology Progress Award”

      The opening ceremony of “Wenzhou Dongtou High-end Energy Storage Equipment Manufacturing and Demonstration Application Integration Project” was successfully held

      The roll-out and production ceremony of the first WTGS of Northern Headquarters (Ulanqab) Intelligent Industrial Base was successfully held

      Won the title “Outstanding Unit in Incorruptibility Construction in Zhejiang Province”

    • 2023

      The Company was officially renamed as WINDEY Energy Technology Group Co., Ltd.

      Windey officially joined the United Nations Global Compact.

      WINDEY’s first 13MW-class onshore WTGS full-power test platform in China was put into use.

      Windey makes Chinese wind turbines stand in Serbia for the first time.

      WINDEY Chuxiong Intelligent Manufacturing Base was put into production, or its first large-megawatt WTGS rolled off the production line.

      The first large-megawatt WTGS of WINDEY Yongzhou Base rolled off the production line.

      WINDEY (Wenzhou) Smart Energy Storage Production Base was officially put into production.

      The world's first 180-meter ultra-high-performance concrete material mixing tower WTGS was hoisted.

      WINDEY continuously won the highest rating “A” for information disclosure of listed companies on the Growth Enterprise Market of Shenzhen Stock Exchange.

      WINDEY, on behalf of China’s complete wind power enterprises, achieved export of technologies and standards for the first time.

      WINDEY 16-18MW floating offshore WTGS, as the world’s largest one, rolled off the production line.

      WINDEY was included into the list of state-level "Science and Technology Reform Enterprises".

      10MW onshore WTGS with the world’s largest diameter for wind wheel and the largest power for single generator set was connected to the grid.

      WINDEY offshore wind power project with the largest scale for single project and the largest capacity for single generator set in Zhejiang Province was delivered in full capacity.

      The world's first-ever "One Machine, One Storage" solution was applied in batch, improving the WTGS’s grid friendliness.

      Joined hands with Ningbo Zhoushan Port, the world's largest port, to build "Zero-carbon Port for Integration of Wind, PV, and Storage".

    • 2024

      Windey Corporation ranks among the top three in the BNEF global wind power rankings in terms of newly installed capacity nationwide and fourth globally
      Leading 10MW onshore wind turbines into the era of bulk commercial delivery
      The first 16MW-18MW offshore wind turbine prototype of Windey "Haiying" platform has been successfully hoisted
      Windey has successfully won the bid for the largest IPP wind power project in the Middle East - the fourth round of wind power projects in Saudi Arabia
      Windey Intelligent Storage Company is listed on the BNEF Tier 1 Global Tier 1 Energy Storage Manufacturer List
      Windey has been officially awarded the title of "Future Factory" in Zhejiang Province
      Windey has become a member enterprise of APQP4Wind
      The world's first 180 meter ultra-high hybrid tower wind power project has its first batch of units connected to the grid
      Windey has obtained the first International Sustainability and Carbon Certification (ISCC) certificate for green methanol raw materials based on farms/plantations in China
      Singapore Windey International Limited officially unveiled its plaque
      Windey has won the highest A-level rating for information disclosure of listed companies on the Shenzhen Stock Exchange's Growth Enterprise Market for three consecutive years
      Windey was successfully selected as the "People's Craftsmanship Brand" for 2024